Komatsu Yedek Parçaları

Örnek İş Makinaları / Yedek Parça Sistemi

ÖRNEK İŞ MAKİNALARI / KOMATSU YEDEK PARÇA SİSTEMİ

Liste Görünümü | Resimli Görünüm
No Parça No Parça Adı Miktar Seçenekler
1 Hydraulic Tank 1
2 Hydraulic Tank, Provision For 1-Actuator 1
3 Hydraulic Tank, For Loading Shovel Configuration 1
4 Control Valve, For Loading Shovel Configuration 1
5 Control Valve 1
6 Control Valve, With Provision For Breaker 1
7 Control Valve, With Provision For 1-Actuator 1
8 Control Valve, With 1-service Valve 1
9 Piston Pump 1
10 Piston Pump 1
11 Gear Pump 1
12 Suction Piping 1
13 Delivery Piping 1
14 Oil Cooler Piping 1
15 Return Piping, For Loading Shovel Configuration 1
16 Return Piping 1
17 Return Piping, With Provision For 1-Actuator 1
18 Drain Piping, For Loading Shovel Configuration 1
19 Drain Piping 1
20 Boom Piping 1
21 Boom Piping, For Loading Shovel Configuration 1
22 Arm and Bucket Piping, For Loading Shovel Configuration 1
23 Arm and Bucket Piping 1
24 Arm and Bucket Piping, With Provision For 1-Actuator 1
25 Hydraulic Drift Prevention Valve Piping, With Boom Hydraulic Drift Prevention Valve, For Loading Shovel Configuration 1
26 Hydraulic Drift Prevention Valve Piping, With Boom Hydraulic Drift Prevention Valve 1
27 Hydraulic Drift Prevention Valve Piping, With Boom and Arm Hydraulic Drift Prevention Valve 1
28 Attachment Piping, With Provision For Breaker 1
29 Attachment Piping, With 1-service Valve 1
30 Attachment Piping, With Breaker Unit For Low Back Pressure 1
31 Attachment Piping, With Provision For 1-Actuator 1
32 Attachment Piping, For Loading Shovel Configuration 1
33 Travel Piping 1
34 Swing Piping 1
35 Fan Motor Piping 1
36 O.L.S.S. Piping 1
37 Solenoid Valve Piping 1
38 Solenoid Valve Piping, Provision For 1-Actuator 1
39 Shuttle Valve Piping 1
40 Shuttle Valve Piping, For Loading Shovel Configuration 1
41 Proportional Pressure Control (PPC) Main Piping 1
42 Proportional Pressure Control (PPC) Main Piping, With Provision For 1-Actuator 1
43 Proportional Pressure Control (PPC) Main Piping, For Loading Shovel Configuration 1
44 Proportional Pressure Control (PPC) Main Piping, With Boom and Arm Hydraulic Drift Prevention Valve 1